Showing posts with label deliveries. Show all posts
Showing posts with label deliveries. Show all posts

Sunday, December 15, 2013

2013: Year 6 - Work in Lagos

Sopromar Boatyard:
Time to get our hands dirty again!
Bow Thruster.  I’ve just lashed out and had a new one fitted in the bow – I would have liked to have both a bow and stern thruster but the boat doesn’t have enough room in the stern – too much other stuff.  I’ve been sort of avoiding fitting a bow thruster, almost as a matter of pride (plus they’re not cheap) and, after I’ve bumped my way around a marina, I could always say “well, I don’t have a bow thruster like you people.”  I’ve also seen a number of times skippers playing with their bow thrusters, and at the same time getting into difficulties, when they should just be motoring forward into their berth.  However, just about everyone I’ve met that has a bow thruster seems to swear by them.  So, providing mine works okey I’ll not have any more excuses when manoeuvring in and out of marinas.  Its been professionally fitted at Sopromar Boatyard.  No fuss!
We arrived to a new bow thruster (WJ3's now sprouting nostrils)
Spinnaker Furler.  We have a cruising chute which hasn’t been getting enough use because it’s contained in a sock (which is good) but requires a bit of work to set and take down.  We can both envision me getting wrapped up in a chute, going overboard and Galley Slave left to sort everything out, return to pick me up and us both being terribly traumatized by the whole event.  Much better to do everything from the cockpit, just like we (almost) do now.  So, I’m presently trying to purchase a spinnaker furler, which is not as easy as it sounds.  Anti-torsion lines are a real problem to obtain apparently and so I’ve been trying to make this purchase for a couple of months now.   I’ll report on how things turn out later on.
Even Bruce got some attention this year!

And we had time for some local siteseeing

Before Launch Day arrived
(& our mission this year - to cross to Turkey)

Saturday, December 14, 2013

2012: Hot for the Rock

Repairs & Upgrades Underway: Gibraltar
Great, we've made it in time for the Rugby finals!
Passerelle/Gangplank.   I don’t know if I’ve spelt it correctly but, in effect, it’s a gang plank, walkway that you attach to the bow or stern of the boat, depending on whether your boat is bow on or stern in to a jetty, pontoon, etc.  In Gibraltar everyone had a plank except us so we had to climb over the pulpit and then step out boldly to get onto the (fixed) jetty – not for the faint hearted.  I made a passerelle out of an aluminium ladder with a ply plank bolted to the rungs (plank sourced from a local wheely bin).  At one end, where it lay on the jetty, I bolted a couple of wheels on (to allow for movement from swell, tide, wakes made by various passing traffic).  It was a draw bridge arrangement so that the wheeled end was elevated when not going ashore, which was most of the time.  The boat end of the passerelle was attached, with ropes, at right angles across a sturdy piece of timber that I had bolted (with u bolts) to the base of the pulpit – it had to take the full weight of me with groceries, etc.  The ropes acted as hinges allowing the plank to be raised and lowered quite easily.  The jetty end of the plank also had a bridle attached to it (separated a bit just over head height by a piece of plastic conduit) and the top end of the bridle was attached to the end of the spinnaker halyard.  Pull on the spinnaker halyard and the bridge rises – lower the halyard to let the wheeled end down on to the jetty.   To assist to make lowering and raising easier I attached a jerrycan of water to the bottom end of the halyard so that it became a one handed job  to raise and lower the plank.  It works well and the whole thing cost (ladder, wheels, bolts) about 80 GBP.  Alternatively you can buy very nice folding ones from a chandler for about 350 GBP.
Our new passerelle - works very nicely, thank you
Television and Movies.  In Gibraltar, with time on our hands, again due to my crook wrist, I purchased and installed a television and DVD player.   I also purchased an extendable bracket to mount it on the bulkhead so that I can hold the screen immobile against the wall while sailing but can also extend the screen and rotate it when viewing it from the comfort of our saloon table while at anchor etc.   It was pretty simple really.  Televisions generally only came in 240 volt or 110 volt (which I needed).   There was a 12 volt car model available but it was expensive, and very small – ie the screen was about the same size as an aircraft one that sits on the back of the seat in front of you.  For power I ran the power cable to the nearest 110 volt power point.  The DVD player simply plugs into the TV, however, we never use it.   We have been given a heap of movies on a hard drive which I have installed in a plastic bag that simply hangs on the back of the bulkhead mounting bracket.  All controls are done through the remote, which came with the TV.  I don’t know why I didn’t do this a long time ago.

We found, the hard way, that the screen can swing about in a seaway so we put two SS saddles on either side of the mounting bracket, covered the screen with a towel and use a bungee strap to hold the screen securely against the bulkhead so it can’t leap around anymore.
Why have TV with views like this?
Digital Weather Station.  In early days we purchased and mounted a Plastimo brass barometer and a clock on the bulkhead – very shippy and they look great.  The barometer has been a little disappointing for us, however, since it hardly moves – it only shows major changes in pressure which is obviously better than nothing but still limited when compared with other barometers I have used in the past.    We were impressed by the results demonstrated by someone else who had a portable digital weather station plus we had one at home and, after a quick check of Amazon, a new one – LA CROSSE TECHNOLOGY – battery operated – arrived soon after purchase.  It’s great – very accurate and shows pressure variations constantly, plus a whole lot of other information.  I still like the brass meters on the bulkhead, however!!

Shelves in Port Locker.  In the port quarter guest room, which we have converted to a storage room, there is a hanging locker that wasn’t been used to hang anything, only for storing things.  It was an inefficient use of space.  I installed some shelves and now it holds twice as much as before.  Good idea provided by the Galley Slave (GS) who took one of the shelves to expand her galley holdings.

Solar Vent for Compost Loo.  After several years of being on constantly, our solar vent exhaust fan/motor gave up.  The battery is still okey but I couldn’t source a spare motor.  So, I am now using the little computer exhaust fan that came with the compost loo wired into the boat’s lighting circuit while still venting via the solar vent.  I can unplug when I need to empty the compost bin.

We had no trouble at all filling in time in Gib

Thursday, March 24, 2011

Getting Work Done Overseas (And Home Perhaps)

Getting to dream locations like this in St Croix
It isn’t easy and in fact it can be downright difficult to almost impossible at times to get work done, especially in a foreign country.  I’m sure, like me, you have read stories of boat owners giving up on getting work done in a particular locations.  Alternatively, the work has been shoddy, promises made but not kept, etc.  Herewith some lessons I learnt, sometimes the hard way.  This sort of project is not for the feint hearted and if you intend to do something similar then I recommend following the three ‘P’s’ as someone kindly passed on to me in BVI - Use Patience, Politeness, and Perseverance - Always.

Obtaining Quotes.  By all means try to follow this most basic of rules.  In BVI it was impossible because (when I was there in May/Jun08)  there were large charter fleets which get priority for work, for obvious reasons, as do local boat owners and, of course, super yachts.  There was a great demand for available tradesmen.  I found just getting work done was a major achievement so I forgot all about trying to get quotes.  Of course, I became more adept at judging who to use and who not to (more on this later).   In Trinidad you could get quotes for work to be done and make the appropriate selection – note that there aren’t any charter fleets there to compete against and the industry is geared towards the cruising sailor.  Even in the USA it has been difficult to get a straight quote.

Cheap Labour.  It might exist but I never found it unless you took on a local worker, after hours.  Some of them are quite good, some are less than good.  How do you know the difference – ask around and get firm opinions from fellow cruisers who you know personally that have had satisfactory work done for them.  Get several opinions if you can, it might save you a lot of time, money and heartache later on – a good investment early on.  I often found the more expensive tradesman was cheaper in the long run – a $70 per hour guy who takes one hour to do what you want rather than two hours by the $50 per hour guy.  I also found some tradies were happy to explain to you what they were doing and so you were receiving ‘free’ tuition at the same time – this was invaluable.  You are often charged high rates for time worked but much of the work might be undertaken by semi-skilled labour contracted out.  Labour is not cheap in the Caribbean, anywhere that I went.  The hourly rate for labour in the BVI was around $50-70 (with some notable exceptions) and it was very similar in Trinidad. 
Can lead to unfortunate incidents like this
(That's not us stuck on a coral reef in St Croix!)
Supervision.  I prefer to be present when work is undertaken as workers are often unsupervised.  There are prolific stories of workers simply not doing anything when found by the owners yet, at the same time, owners are being charged for their time.  I had the rudder replaced by a local contractor in BVI and the guy didn’t appear to fully know what he was doing; his philosophy seemed “hit the quadrant hard enough with a hammer and it should fix the problem”.  The casting was broken, had to be welded (twice) and I eventually complained to his boss to come and supervise the work.  I also had to suggest that they place shims around the top of the rudder shaft as the new stainless shaft was slightly smaller than the previous shaft that held the rudder quadrant.  I shouldn’t have had to do that.

Keep Your Yard Informed.  Boatyards generally want their customers to go away happy and prepared to recommend them to other boat owners.  Many marinas have their ‘favourites’ (contractors) that they recommend to you for work to be carried out – they will be those based at the yard or have satisfied some other criteria that allows them to be contracted while still being based elsewhere.   Yards don’t want to employ/recommend contractors that are not giving good service.  This was very entrenched at Power Boats in Trinidad and part of the culture.  It was also very helpful when I was at Nanny Cay Marina in BVI – on one occasion when I was not happy I raised a concern with the yard manager there and he was very supportive and helpful ie he ‘discussed’ the work being done by the contractor to sort out my problems.  Nanny Cay had just employed a full time manager when I was there to look after their customers’ interests. They have a similar system in place at Power Boats.  I wished I had known how important this was when I first started work on my boat.

Check the Paperwork.  Workers will often exaggerate their time on the job and you will pay for it, because they’ve skived off to have a smoke, have a chat with their mates, etc.  On other occasions, they will be scrupulously honest and get you to sign their time sheets.  Check the arrangements first with your contractor.

Getting Work Done When You Are Not There.  I have found it extremely difficult to get work done successfully in our absence.  Generally, things happen when you are there and probably need to be since one often has to make decisions on the spot which aren’t apparent initially eg when there are several options to be considered – difficult to do via email really.  If you are planning to have work done, include time to stay up on the hard or on the dock (at least a week or two) before launching so that you can be there to supervise any work.

Good Contractors.  In BVI my top contractor/technician was a Canadian, also an active sailor at the Bitter End Yacht Club.  Even though his boss charged top dollar, he provided top quality work, talked to me about what he was doing, did more than I asked for and willingly passed on to me other information to help me learn about my engine, plus plus.  My BVI Yacht Sales broker and his fellow staff members were also very good and extremely helpful whenever I bothered them for advice, which was often and wide ranging.  In Trinidad, the expert riggers (local and expat) from Trinidad Rigging were very helpful and professional.  The canvas man, from The Upholstery Shop in Power Boat’s compound in Trinidad, was very cooperative and did excellent work.  In Guadeloupe, when I had to get the generator fuses fixed, an electrician (Waypoint) even went as far as to lend me his personal car so that my son and I could purchase a few bits and pieces on the other side of town. This was exciting for us – driving around a large city on the ‘wrong’ side of the road.  He also explained things as he worked on the generator.  The two marinas - Power Boats in Trinidad and Nanny Cay Marina in BVI - have been great and very helpful.  You just have to find the good people and avoid the not-so-good, a challenge but don’t be afraid to trust your instincts.

Deliveries & Orders.  I would have to advise against picking up bits & pieces along the way as you cruise unless you really have to – let me explain.  Initially, our main constraint was weather (it was the start of the hurricane season and we needed to keep moving on to Trinidad) and our order for a windvane self steering device came (from the UK) in 2 boxes, separately.  We picked up one box and fitted the contents in St Martin – duty free and waited for the next delivery, the all important auxiliary rudder.  We had to move on before the second box arrived so stopped in Antigua then in Guadeloupe; finally the rudder arrived and we could be on our way.  Not before paying duty and being hijacked by a local taxi driver – a most unpleasant experience, which fortunately, the marina staff helped me sort out.  In another instance in BVI we ordered some spare parts.  As they hadn’t arrived before the date we were due to leave, a fixed date we had originally passed onto the contractor, we let the business know we were leaving.  Some four months later, he was still demanding payment for an item we never received, even going so far as to importune the yacht broker staff for the money.  So, keep records of everything – what & when you order, especially who you speak to and what was said!  And remember those 3 P’s…..
And you find yourself in places like this trying to find someone to fix them.
(Jacksonville, Florida)